Project Tag: Biological Resources Technical Report
-
Raptor Conservation Strategy
Duration: January 2016 to October 2016 Location: San Bernardino County, California Client: Mitsubishi Cement and the US Forest Service As Vice President of Bloom Biological, developed the proposal, survey protocol, and managed staff. Also conducted surveys for Golden Eagle nests, including those in remote backcountry areas, and produced in-depth reports and mapping. This project was…
-
Manzana Wind Project
Duration: January 2013 to October 2016 Location: Kern County, California Client: Avangrid Renewables As principal biologist and Vice President of Bloom Biological, England assisted the client in initial discussions on methods for minimizing potential impacts to raptors including Golden Eagle and California Condor, developed a flight identification training program for wind facility staff, and conducted…
-
Terranea Resort
Duration: January 2005 to July 2008 Location: Rancho Palos Verdes, Los Angeles County, California Client: Long Point Development As project manager and Director of Biological Services for Natural Resource Consultants, England led a team in the conduct of dudleya and California Gnatcatcher surveys, vegetation mapping, and collaborated with the client and other consultants on the…
-
Abengoa Mojave Solar Project
Duration: January 2011 to January 2015 Location: San Bernardino County, California Client: AECOM As Vice President of Bloom Biological. The Abengoa Mojave Solar Project is a nominal 250-megawatt solar electric generating facility located near Harper Dry Lake in an unincorporated area of San Bernardino County. The project was certified by the CEC on September 8,…